Day |
Date/AB | Assignment Due (to be done before class starts on date listed at left) |
SEPTEMBER | ||
Tu/W | 27A/28B |
|
F/M | 23A/26B |
|
W/Th | 21A/22B |
|
M/Tu | 19A/20B |
|
Th/F | 15A/16B |
|
Tu/W | 13A/14B |
|
F/M | 9A/12B |
|
W/Th | 7A/8B |
|
Tu | 6AB |
|
OCTOBER | ||
F/M | 30A/3B | |